How we build your pool: our 15 steps
Every PCS pool follows the same 15 steps, from site survey to handover. On average, most concrete pools take 8 to 12 weeks from excavation to completion; weather, permitting and custom requests can affect timing. Typical start is after permits are approved.
- Step 1: Site survey and 3D pool designWe measure your yard and design your pool in 3D.
- Step 2: Prepare construction plans and submit for permitWe draw the plans and file for your permit.
- Step 3: Site prep and stage materialsWe clear the site and bring in materials.
- Step 4: LayoutWe mark the exact shape of your pool.
- Step 5: DigWe excavate to the planned shape and depth.
- Step 6: Steel and rough plumbWe tie the steel and run the main plumbing.
- Step 7: Pool shell with ShotcreteWe spray concrete over the steel to form the shell.
- Step 8: Plumbing installationWe connect the pipes to and from the equipment.
- Step 9: Install pool equipmentWe set the pump, filter and equipment on its pad.
- Step 10: Electrical installationWe wire the equipment and bond the pool for safety.
- Step 11: Tile and copingWe set the waterline tile and the edge coping.
- Step 12: Deck installationWe install the deck around your pool.
- Step 13: Prep pool and install Pebblesheen interiorWe prep the shell and apply the smooth Pebblesheen finish.
- Step 14: Fill pool and start upWe fill the pool, start the equipment and balance the water.
- Step 15: Provide pool operation training and handover to happy customerWe show you how to run your pool, and it's all yours.